Full roof replacement
Tear-off to final walk in as little as two days, with a written scope before we start and photo documentation after.
Learn moreServing Cedar Falls & the Tri-County area
Craft-grade roofing for homes that plan on outliving the weather. Inspected honestly, built precisely, warrantied in writing.
Scroll to build
Five layers stand between your family and the sky. Watch every one of them go on — in order, to spec.
Every layer photographed and signed off before we call it done.
Stage 01 — Structure
Everything above depends on what's below. We walk every rafter, replace soft decking, and re-nail the field to current wind code before a single layer goes on.
Stage 02 — Moisture barrier
A woven synthetic membrane goes down over the whole deck — 12× stronger than felt paper and watertight on its own, so your home is protected even mid-build.
Stage 03 — Water management
Leaks start at the edges. We run ice-and-water shield along eaves and valleys, then hand-bend metal drip edge and flashing at every wall, pipe, and chimney line.
Stage 04 — The field
Class 3 impact-rated architectural shingles, laid to a chalk-lined grid and fastened with six nails per shingle — the spec that holds through 130 mph gusts.
Stage 05 — The finish
A full-length ridge vent lets the attic breathe, matched caps finish the line, and a magnetic sweep clears every nail. Then we walk the roof with you — photos included.
Roofs completed
In business
Average review
Material warranty
What we do
Tear-off to final walk in as little as two days, with a written scope before we start and photo documentation after.
Learn moreSame-week emergency tarping, honest damage assessments, and help navigating your insurance claim end to end.
Learn moreHand-seamed metal roofing rated for 50+ years — quieter than you think, tougher than everything else on the block.
Learn moreSeamless gutters sized to your actual roof area, pitched correctly, and tied into downspouts that move water away.
Learn moreCurb-mounted skylights and balanced intake/exhaust venting that cut attic heat and extend shingle life.
Learn moreA 21-point checkup every spring: seals, flashing, fasteners, and a drone survey — with a report you can actually read.
Learn moreOur work
Illustrated recreation of a hail-claim replacement in Maple Grove — 1 day tear-off to finish.
How it works
A 40-minute on-roof and in-attic inspection with photos of everything we find — no ladder-shy estimates from the driveway.
One fixed price, itemized by layer. No allowances that balloon later, no pressure tactics, valid for 90 days.
A dedicated crew, a site supervisor you can text, tarped landscaping, and a magnetic nail sweep every single evening.
50-year material and 10-year workmanship warranties registered in your name, plus a free checkup at year one.
Word travels
“They found hail damage two other companies missed, handled the entire insurance claim, and the crew left our yard cleaner than they found it.”
Questions
Anything else on your mind? Call us at (555) 014-7788 — a roofer answers, not a phone tree.
Most homes are done in 1–2 days of on-site work. Complex roofs (steep pitches, multiple valleys, skylights) can run 3–4. You'll get a day-by-day schedule with your quote, and we don't start tear-off unless we can dry you in the same day.
Free inspection
A 40-minute inspection, photos of everything we find, and a fixed quote good for 90 days. No pressure, no phone-tree — ever.